Skip to content
×
Home
About Us
Current Projects
Selvam Crown - Vellore
Projects
OAK VIEW
Experience Our Spaces
Selvam Crown - Vellore
Blogs
Contact us
DOORS, WINDOWS & RAILINGS
Main Door
7′-0″ opening, framed & panelled shutter with architrave, per architect.
Bedroom & Toilet Doors
identical 7′-0″ framed, panelled, architraved units.
Windows
branded aluminium / uPVC sliding clear-glass shutters.
French Doors
branded aluminium / uPVC sliding clear-glass panels.
Ventilators
branded aluminium / uPVC openable clear-glass shutters.
STRUCTURE
Earthquake-resistant RCC frame compliant with Seismic Zone III.
Solid concrete-block masonry; internal plaster finish.
7′-0″ lintel height maintained for all doors and windows.
PLUMBING & SANITARYWARE
Plumbing
Single-lever hot/cold diverter in showers;
concealed master stopcock per toilet;
geyser provision in every toilet.
Sanitaryware
Wall-mounted washbasins and EWCs with concealed cistern + health faucet.
Fittings
Ceramic & CP fixtures by Grohe / Kohler (or equivalent).
FLOORING & TILES
Foyer / Living / Dining / Bedrooms / Kitchen
vitrified tiles with matching skirting; kitchen backsplash glazed tiles to 2′-0″.
Utility
ceramic floor tiles + 4′-0″ dado.
Toilets
ceramic floor tiles + 7′-0″ wall dado.
Decks
non-skid ceramic tiles with skirting.
KITCHEN & UTILITY
Polished double-nose black-granite counter on RCC base with brick backing.
Stainless-steel sink + drainboard in kitchen and utility (Franke or equivalent).
Provision points for chimney and exhaust fan.
PAINTING FINISHES
Internal Walls
cement putty, primer, two coats premium emulsion (Asian or equivalent).
Ceilings
cement putty, primer, two coats emulsion.
Exteriors
primer + two coats weather-resistant paint (Asian or equivalent) as per architect’s palette.
ELECTRICAL WIRING & DISTRIBUTION
Concealed FRLS wiring for 3-phase supply; ISI-compliant conduits.
TV, data, and light points in all bedrooms, kitchen, living.
Switches & sockets – Legrand / Anchor; wires – Polycab / Anchor.
AC points in living and bedrooms; DB & MCB by MDS / Legrand.
Individual three-phase energy meter per flat.
COMMON AREAS
Ground-Floor Lobby
imported marble / granite.
Staircases
granite treads + MS handrail.
Upper-Floor Lobbies
polished granite; elevator cladding as per design.
External Paving
concrete interlock blocks; landscaped gardens.
Elevators
1×8-pax + 1×16-pax (Johnson / Kone).
Generator
backup for lifts, motors & common lighting.
SECURITY
CCTV surveillance in all common zones.
Video-phone intercom from each apartment to security room.
Access-control system at ground-floor lobby entrance.